Engineering that works : Engineering with style

Home Up Contents

Methodist Church
Methodist Church Baptist Church Free Consultation

 

   

Looking at the church from the southeast, the new wing is on the right and matches the existing church on the left, windows were moved to complete the effect

First United Methodist Church

The church needed education facilities, restroom facilities, a new nursery, offices, a new kitchen and a larger fellowship hall.  The congregation was quite small (about 50 people attending on Sunday mornings) but had a vision.  The addition was constructed in 1997 and consisted of a basement and first story.  Total square footage added was 6000 and the cost was $335,000 (less than $56 per square foot.)  After the addition was complete, the congregation did some remodeling to convert the old open fellowship hall into offices and a new nursery.

 

Contact Information

Office Hours: Monday - Friday

 8 a.m. - 5 p.m.

Telephone: (765) 677-0996

Fax: (765) 677-0997

236 East Main Street

Gas City, IN  46933

Electronic mail: LCRANDALL@crandalleng.com

 

 

Home ] Up ]