Engineering that works : Engineering with style
|
|
|
Looking at the church from the southeast, the new wing is on the right and matches the existing church on the left, windows were moved to complete the effect First United Methodist Church The church needed education facilities, restroom facilities, a new nursery, offices, a new kitchen and a larger fellowship hall. The congregation was quite small (about 50 people attending on Sunday mornings) but had a vision. The addition was constructed in 1997 and consisted of a basement and first story. Total square footage added was 6000 and the cost was $335,000 (less than $56 per square foot.) After the addition was complete, the congregation did some remodeling to convert the old open fellowship hall into offices and a new nursery.
Contact Information Office Hours: Monday - Friday 8 a.m. - 5 p.m. Telephone: (765) 677-0996 Fax: (765) 677-0997 236 East Main Street Gas City, IN 46933 Electronic mail: LCRANDALL@crandalleng.com
|